In Re:Petition of Green Mountain Power Corporation ("GMP") for a certificate of public good, pursuant to 30 V.S.A. § 248, authorizing the reconstruction of the GMP White River Junction Substation located at Maplewood Terrace in Hartford, Vermont, including: (1) the construction of a new 2.73-mile 46 kV transmission line along Old River Road and Mill Road to the substation with a new under built single circuit distribution circuit to replace the existing distribution line; 2) the replacement of the existing 13.8 kV National Grid feed with a new 15/28 MVA substation; and (3) the installation of a 5.4 MVAR 46 kV capacitor bank at the new substation
Before Jay Dudley, Hearing Officer
Location: Public Service Board Hearing Room, Third Floor, People's United Bank Building, 112 State Street, Montpelier, Vermont